King of the Hills (KOTH) was acquired by Genesis as a result of the merger with Vault Minerals in November 2026.
Located approximately 25 km north of Leonora in the Eastern Goldfields region of WA, the operation comprises the KOTH OP and KOTH UG Mines (together, ‘the KOTH Mines’), the Darlot UG Mine, and the KOTH Processing Hub.
The KOTH Processing Hub is the central processing facility for ore sourced from the KOTH Mines and the Darlot UG Mine. The facility had an original nameplate design of 4.0 million tonnes per annum (‘Mtpa’) incorporating conventional grinding and carbon-in-leach (‘CIL’) technology. The KOTH Processing Hub operated at a 5.4Mtpa run rate in FY26.
In December 2024, Vault announced a planned expansion of the KOTH Processing Hub to increase processing capacity to 6 Mtpa. The expansion involved the construction of a new crushing circuit as well as wet plant modifications for an estimated capital cost of approximately $80 million.
In May 2025, Vault announced a second expansion stage involving the addition of a 9-megawatt regrind ball mill, increasing the total capital cost to approximately $172 million and targeting processing capacity of approximately 7.5 – 8.0 Mtpa upon completion. Stage one of the expansion was completed in March 2026 following the commissioning of the new crushing circuit and associated infrastructure.
The expansion forms part of the Company’s broader Leonora operating strategy, which is supported by an increase in open-pit Ore Reserves and an extended operating life.
During FY26, the KOTH Processing Hub treated approximately 5.43 million tonnes (‘Mt’) of ore and produced approximately 180 thousand ounces (‘koz’) of gold at an all-in sustaining cost (‘AISC’) of $2,723 per ounce (‘oz’).
Commercial production from the KOTH Mines commenced in December 2022. Mining operations at both the open-pit and underground mines are currently undertaken by Macmahon Holdings Limited under contract. In November 2025, the Company announced its intention to transition open-pit load-and-haul activities at KOTH to an owner-operator model following the scheduled expiry of the existing mining services contract on 31 December 2026. In September 2025, the Company announced plans to increase mining rates at the KOTH OP Mine to support additional processing capacity associated with the KOTH Processing Hub expansion.
Resource definition drilling also continued during FY26, with underground drill programs focused on identifying opportunities for underground Mineral Resource growth and potential extensions to mine life beyond the current Ore Reserve. In FY26, approximately 7.33 Mt of ore was mined from the KOTH OP Mine, containing approximately 124 koz of gold. Over the same period, approximately 0.90 Mt of ore was mined at the KOTH UG Mine containing approximately 48 koz of gold.