Darlot was acquired by Genesis as a result of the merger with Vault Minerals in November 2026.
The Darlot UG Mine is a long-life gold operation with a production history spanning more than 35 years. The asset was previously owned and operated by several mining companies before being acquired by Red 5 from Gold Fields Limited in October 2017. The Darlot UG Mine is located approximately 100 km by road from the KOTH operations.
Historically, ore from the Darlot UG Mine was processed through the Darlot processing plant (‘Darlot Processing Plant’), which comprised a 1.0 Mtpa CIP and CIL processing facility. In July 2022, processing activities ceased and the Darlot UG Mine transitioned to supplying ore to the KOTH Processing Hub. The consolidation of processing activities at the KOTH Processing Hub formed part of the Company’s strategy to centralise ore processing across Vault’s Leonora Operations.
Exploration and resource definition drilling activities continued at Darlot during FY26. On 27 February 2026, Vault reported results from a 17,133 m drilling program that identified additional mineralisation within the Pipeline and Warne zones. The drilling program is intended to support Mineral Resource conversion and further evaluation of future Ore Reserve potential within these areas. 11 In February 2026, in addition to ongoing exploration activities, Vault commenced a review of opportunities to recommence operations at the Darlot Processing Plant through a potential refurbishment program.
During FY26, approximately 0.73Mt of ore was mined from the Darlot UG Mine, containing approximately 55koz of gold.